A) This depends on the material most suitable for the surface. Thermoplastic material dries within a minute where as other materials drying time can take up to 20 minutes.
A) The surface needs to be clear of any obstruction and swept clean of any dust or dirt. Cleaning and sweeping of the surface before installing is part of the Road Marking Groups preparation stage.
A) The simple answer to that is NO! When wet, the surface can be dried with a drying machine or a thermo lance then installed on the now warm dry patches, but when raining none of the road marking materials will bond to any surface. Line removal can take place in any weather conditions.
A) Yes, line removal is part of our service, we have different methods of removal, click here to see the options. We will advise you onsite the best method to remove the markings from the surface in question.